{"id":2676,"date":"2025-12-26T07:35:35","date_gmt":"2025-12-26T07:35:35","guid":{"rendered":"https:\/\/chinaledscreens.com\/?p=2676"},"modified":"2026-02-23T02:19:16","modified_gmt":"2026-02-23T02:19:16","slug":"how-to-import-transparent-led-displays-from-china-2026-guide","status":"publish","type":"post","link":"https:\/\/chinaledscreens.com\/fr\/how-to-import-transparent-led-displays-from-china-2026-guide\/","title":{"rendered":"How to Import Transparent LED Displays from China (2026 Guide)"},"content":{"rendered":"\n<div class=\"wp-block-greenshift-blocks-container alignwide gspb_container gspb_container-gsbp-294415b\" id=\"gspb_container-id-gsbp-294415b\">\n<div class=\"wp-block-greenshift-blocks-container gspb_container gspb_container-gsbp-d9ea1af\" id=\"gspb_container-id-gsbp-d9ea1af\">\n<div class=\"wp-block-greenshift-blocks-image gspb_image gspb_image-id-gsbp-9be3f30\" id=\"gspb_image-id-gsbp-9be3f30\"><img decoding=\"async\" src=\"https:\/\/chinaledscreens.com\/wp-content\/uploads\/2025\/12\/How-to-Import-Transparent-LED-Displays-from-China-2026-Guide.jpeg\" data-src=\"\" alt=\"How to Import Transparent LED Displays from China (2026 Guide)\" loading=\"lazy\" width=\"1400\" height=\"594\"\/><\/div>\n<\/div>\n<\/div>\n\n\n\n<h1 class=\"alignwide\">How to Import Transparent LED Displays from China (2026 Guide)<\/h1>\n\n\n\n<div class=\"wp-block-greenshift-blocks-container alignwide gspb_container gspb_container-gsbp-99f7b36\" id=\"gspb_container-id-gsbp-99f7b36\">\n<div class=\"wp-block-greenshift-blocks-container gspb_container gspb_container-gsbp-c559416\" id=\"gspb_container-id-gsbp-c559416\">\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"why-importing-transparent-led-is-different-and-why-projects-fail-\">Why importing transparent LED is different (and why projects fail)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Transparent LED isn\u2019t \u201cjust another LED wall.\u201d You\u2019re importing a&nbsp;<strong>system that must behave like architecture<\/strong>: it lives on glass, fights daylight, runs long duty cycles, and must stay serviceable without turning a fa\u00e7ade into a maintenance nightmare.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Most failed imports follow the same pattern:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>The buyer compares spec sheets instead of&nbsp;<strong>use-case reality<\/strong><\/li>\n\n\n\n<li>The supplier quotes a \u201cgood\u201d configuration, then quietly swaps parts under pressure<\/li>\n\n\n\n<li>QC is reduced to \u201cpower on + no dead pixels\u201d<\/li>\n\n\n\n<li>Logistics and spares are treated as an afterthought<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This guide is written for engineers, integrators, agencies, and project owners who want&nbsp;<strong>repeatable import outcomes<\/strong>, not one lucky shipment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If you\u2019re still deciding which transparent category you actually need, start with a practical baseline like this&nbsp;<a href=\"https:\/\/chinaledscreens.com\/transparent-led-display-guide-2025\/\">transparent LED display guide<\/a>&nbsp;and then come back to the import workflow.<\/p>\n\n\n\n<div class=\"wp-block-rank-math-toc-block\" id=\"rank-math-toc\"><h2>Table of Contents<\/h2><nav><ul><li><a href=\"#why-importing-transparent-led-is-different-and-why-projects-fail-\">Why importing transparent LED is different (and why projects fail)<\/a><\/li><li><a href=\"#step-0-define-what-you-re-importing-before-you-ask-for-a-price-\">Step 0: Define\u00a0what\u00a0you\u2019re importing (before you ask for a price)<\/a><\/li><li><a href=\"#step-1-build-a-shortlist-that-filters-out-80-of-risk\">Step 1: Build a shortlist that filters out 80% of risk<\/a><\/li><li><a href=\"#step-2-write-an-rfq-that-prevents-the-spec-sheet-trap-game\">Step 2: Write an RFQ that prevents the \u201cspec sheet trap\u201d game<\/a><\/li><li><a href=\"#step-3-sampling-and-mock-ups-the-cheapest-insurance-you-can-buy-\">Step 3: Sampling and mock-ups (the cheapest insurance you can buy)<\/a><\/li><li><a href=\"#step-4-compliance-and-documentation-you-must-request-early\">Step 4: Compliance and documentation you must request early<\/a><\/li><li><a href=\"#step-5-incoterms-and-the-real-cost-structure\">Step 5: Incoterms and the real cost structure<\/a><\/li><li><a href=\"#step-6-payment-terms-that-protect-both-sides-without-killing-cooperation-\">Step 6: Payment terms that protect both sides (without killing cooperation)<\/a><\/li><li><a href=\"#step-7-qc-that-matches-transparent-led-reality-not-generic-led-qc-\">Step 7: QC that matches transparent LED reality (not generic LED QC)<\/a><\/li><li><a href=\"#step-8-packaging-shipping-and-customs-execution\">Step 8: Packaging, shipping, and customs execution<\/a><\/li><li><a href=\"#step-9-installation-spares-and-after-sales-where-import-roi-is-decided-\">Step 9: Installation, spares, and after-sales (where import ROI is decided)<\/a><\/li><li><a href=\"#a-realistic-import-timeline-plan-backward-from-opening-day-\">A realistic import timeline (plan backward from opening day)<\/a><\/li><li><a href=\"#the-deep-import-habits-that-separate-pros-from-first-timers\">The \u201cdeep\u201d import habits that separate pros from first-timers<\/a><\/li><li><a href=\"#closing-make-your-first-import-repeatable\">Closing: make your first import repeatable<\/a><\/li><\/ul><\/nav><\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"step-0-define-what-you-re-importing-before-you-ask-for-a-price-\">Step 0: Define&nbsp;<em>what<\/em>&nbsp;you\u2019re importing (before you ask for a price)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Transparent LED isn\u2019t one product family. Your import plan changes depending on whether you\u2019re buying:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Retail window displays (close viewing, reflection control, \u201coff-state\u201d aesthetics)<\/li>\n\n\n\n<li>Media fa\u00e7ades (brightness strategy, wind load, access\/service)<\/li>\n\n\n\n<li>Glass-integrated systems (glass lamination constraints, optical behavior)<\/li>\n\n\n\n<li>Lightweight mesh\/grille styles (structural + transparency priority)<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Before your RFQ goes out, freeze these \u201cnon-negotiables\u201d:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Viewing distances<\/strong>&nbsp;(min\/typical\/max) and required content type (text vs video)<\/li>\n\n\n\n<li><strong>Daylight conditions<\/strong>&nbsp;(orientation, competing light, glass reflectance)<\/li>\n\n\n\n<li><strong>Transparency goal<\/strong>&nbsp;(optical effect, not marketing percentage)<\/li>\n\n\n\n<li><strong>Service strategy<\/strong>&nbsp;(front access vs rear access, module replacement logic)<\/li>\n\n\n\n<li><strong>Operating schedule<\/strong>&nbsp;(hours\/day, summer ambient, thermal limits)<\/li>\n\n\n\n<li><strong>Local compliance constraints<\/strong>&nbsp;(building codes, electrical standards, signage rules)<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">If you need a structured way to translate \u201capplication\u201d into a product direction, browsing a supplier\u2019s use-case map can help\u2014e.g.,&nbsp;<a href=\"https:\/\/chinaledscreens.com\/solutions\/\">transparent LED display solutions<\/a>&nbsp;pages often reveal how they think about scenarios, constraints, and tradeoffs.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"step-1-build-a-shortlist-that-filters-out-80-of-risk\">Step 1: Build a shortlist that filters out 80% of risk<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"manufacturer-vs-seller-\">Manufacturer vs \u201cseller\u201d<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">In China, you\u2019ll meet:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Actual manufacturers<\/strong>&nbsp;(control process, stable BOM, real QC ownership)<\/li>\n\n\n\n<li><strong>Integrators\/traders<\/strong>&nbsp;(can be fine, but you must verify supply chain control)<\/li>\n\n\n\n<li><strong>Marketing-only sellers<\/strong>&nbsp;(quote anything, outsource everything)<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">A quick filter:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Ask for the&nbsp;<strong>factory address<\/strong>,&nbsp;<strong>production photos\/video<\/strong>, and&nbsp;<strong>serial-number traceability<\/strong>&nbsp;examples<\/li>\n\n\n\n<li>Ask who owns the&nbsp;<strong>calibration system<\/strong>&nbsp;and who writes the&nbsp;<strong>aging\/burn-in procedure<\/strong><\/li>\n\n\n\n<li>Ask whether the quoted model has&nbsp;<strong>repeatable BOM<\/strong>&nbsp;(same LED bin, same driver IC family, same PSU spec)<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">If you want a reference point for how a factory-led supplier positions itself (R&amp;D + manufacturing + export workflows), you can look at how&nbsp;<a href=\"https:\/\/chinaledscreens.com\/\">ChinaLEDScreens<\/a>&nbsp;introduces its scope and product coverage\u2014then use those same questions on every supplier you evaluate.<\/p>\n\n\n\n<div class=\"wp-block-greenshift-blocks-image gspb_image gspb_image-id-gsbp-0b8d0e0\" id=\"gspb_image-id-gsbp-0b8d0e0\"><img decoding=\"async\" src=\"https:\/\/chinaledscreens.com\/wp-content\/uploads\/2025\/12\/transparent-led-display-Manufacturer-vs-seller.jpeg\" data-src=\"\" alt=\"transparent led display Manufacturer vs \u201cseller\u201d\" loading=\"lazy\" width=\"1400\" height=\"764\"\/><\/div>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"don-t-skip-the-projects-proof-\">Don\u2019t skip the \u201cprojects proof\u201d<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Spec sheets are easy to polish. Real installations are harder to fake.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ask for:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Project photos&nbsp;<strong>with context<\/strong>&nbsp;(distance, daylight, mounting approach)<\/li>\n\n\n\n<li>A short \u201cwhat went wrong + how we fixed it\u201d story (good suppliers have scars)<\/li>\n\n\n\n<li>Confirmation of&nbsp;<strong>spare part continuity<\/strong>&nbsp;for 5\u20137 years<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">A good sanity check is to browse a supplier\u2019s&nbsp;<a href=\"https:\/\/chinaledscreens.com\/projects-case-studies\/\">projects and case studies<\/a>&nbsp;and see if the installations resemble your environment (wind, humidity, salt air, desert sun, etc.).<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"step-2-write-an-rfq-that-prevents-the-spec-sheet-trap-game\">Step 2: Write an RFQ that prevents the \u201cspec sheet trap\u201d game<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A strong RFQ forces suppliers to quote the same reality.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"rfq-essentials-copy-paste-\">RFQ essentials (copy\/paste)<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>A) Configuration lock<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Panel\/module size, pixel pitch options you\u2019ll accept<\/li>\n\n\n\n<li>Required transparency target (and how it must be measured)<\/li>\n\n\n\n<li>Brightness requirements stated as&nbsp;<strong>sustained<\/strong>, not peak<\/li>\n\n\n\n<li>Required refresh rate range and grayscale expectations<\/li>\n\n\n\n<li>Front\/rear IP expectations and environmental notes<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>B) BOM disclosure<\/strong>&nbsp;Ask them to state:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>LED package type + binning policy<\/li>\n\n\n\n<li>Driver IC family<\/li>\n\n\n\n<li>PSU brand\/spec<\/li>\n\n\n\n<li>Control system and receiving card ecosystem<\/li>\n\n\n\n<li>Cable\/connector standard and sealing approach<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>C) Acceptance criteria<\/strong>&nbsp;Define what \u201cpass\u201d means:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Dead pixel thresholds<\/li>\n\n\n\n<li>Color uniformity tolerance (or calibration method)<\/li>\n\n\n\n<li>Brightness deviation limits across panels<\/li>\n\n\n\n<li>Aging time requirement (e.g., 48\u201372h run-in before packing)<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">When suppliers must quote against your acceptance criteria, you\u2019ll see who is building a system\u2014versus who is only selling a number.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"step-3-sampling-and-mock-ups-the-cheapest-insurance-you-can-buy-\">Step 3: Sampling and mock-ups (the cheapest insurance you can buy)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For transparent LED, a sample is not just a \u201cmodule.\u201d It\u2019s a&nbsp;<strong>behavior test<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Minimum sampling set:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>1\u20132 panels\/modules (same BOM as production)<\/li>\n\n\n\n<li>The intended control chain (sending\/receiving cards, PSU, cabling)<\/li>\n\n\n\n<li>A small frame or mounting simulation if your project is fa\u00e7ade-based<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">What to test (in your own environment if possible):<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Daylight readability at the actual install orientation<\/li>\n\n\n\n<li>Gradient banding, low-gray performance, and color shift at angles<\/li>\n\n\n\n<li>Thermal behavior after 4\u20138 hours continuous run<\/li>\n\n\n\n<li>Service action: can a tech swap a module without \u201cbreaking the fa\u00e7ade\u201d?<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">If the supplier pushes back on sampling or tries to substitute \u201cwe already tested,\u201d treat that as signal.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"step-4-compliance-and-documentation-you-must-request-early\">Step 4: Compliance and documentation you must request early<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Import friction often comes from paperwork\u2014not hardware.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Ask your supplier to confirm what they can provide:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Commercial invoice + packing list (with correct HS code guidance)<\/li>\n\n\n\n<li>Bill of lading \/ airway bill<\/li>\n\n\n\n<li>Certificate of origin (if needed for your customs strategy)<\/li>\n\n\n\n<li>Test\/inspection reports relevant to your project requirements<\/li>\n\n\n\n<li>Electrical safety documentation aligned with your market expectations<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Important: your importer\/broker should validate HS codes and local requirements. Don\u2019t let \u201cthe factory always uses this code\u201d become your liability.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"step-5-incoterms-and-the-real-cost-structure\">Step 5: Incoterms and the real cost structure<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Transparent LED imports can look \u201ccheap\u201d until freight, duties, crates, insurance, and onsite surprises hit.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"common-incoterms-practical-interpretation-\">Common Incoterms (practical interpretation)<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>EXW<\/strong>: cheapest quote, highest buyer responsibility and risk<\/li>\n\n\n\n<li><strong>FOB<\/strong>: supplier delivers to port; buyer controls sea freight and insurance<\/li>\n\n\n\n<li><strong>CIF<\/strong>: supplier arranges main transport; buyer still handles import\/customs<\/li>\n\n\n\n<li><strong>DDP<\/strong>: supplier claims \u201call-in,\u201d but you must scrutinize what\u2019s actually included<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">For most professional buyers,&nbsp;<strong>FOB<\/strong>&nbsp;is often the cleanest balance: you control freight\/insurance and reduce surprises.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Hidden-cost zones to watch:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Crating (especially for glass-integrated or premium fa\u00e7ade panels)<\/li>\n\n\n\n<li>Spare modules and matching bins (small cost now, huge cost later)<\/li>\n\n\n\n<li>Engineering drawings and special mounting hardware<\/li>\n\n\n\n<li>Replacement lead times if BOM changes mid-project<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"step-6-payment-terms-that-protect-both-sides-without-killing-cooperation-\">Step 6: Payment terms that protect both sides (without killing cooperation)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Typical structures you\u2019ll see:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>30\/70 (deposit \/ before shipment)<\/li>\n\n\n\n<li>50\/50 for small orders or urgent delivery<\/li>\n\n\n\n<li>LC for large orders (depends on buyer\/supplier maturity)<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Risk controls that don\u2019t insult good suppliers:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Tie milestone payments to&nbsp;<strong>factory acceptance testing (FAT)<\/strong><\/li>\n\n\n\n<li>Use third-party inspection before final balance (especially for first order)<\/li>\n\n\n\n<li>Lock BOM and change-control rules in the PI\/contract:\n<ul class=\"wp-block-list\">\n<li>\u201cNo substitutions without written approval\u201d<\/li>\n\n\n\n<li>\u201cAny approved substitution requires updated sample validation or test proof\u201d<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"step-7-qc-that-matches-transparent-led-reality-not-generic-led-qc-\">Step 7: QC that matches transparent LED reality (not generic LED QC)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">A transparent LED system can \u201cturn on\u201d and still fail in the field. You want QC that reflects operational reality.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Minimum QC layers:<\/p>\n\n\n\n<ol class=\"wp-block-list\">\n<li><strong>Incoming material controls<\/strong>&nbsp;(LED bin consistency, PSU\/IC lot control)<\/li>\n\n\n\n<li><strong>In-process checks<\/strong>&nbsp;(soldering quality, sealing\/connector integrity)<\/li>\n\n\n\n<li><strong>Aging\/burn-in<\/strong>&nbsp;under load (not a 10-minute power-on)<\/li>\n\n\n\n<li><strong>Calibration and uniformity validation<\/strong><\/li>\n\n\n\n<li><strong>Pack-out inspection<\/strong>&nbsp;(labels, spares, cables, documentation)<\/li>\n<\/ol>\n\n\n\n<p class=\"wp-block-paragraph\">When evaluating a supplier, look for how they describe their manufacturing discipline and test philosophy. For example, a dedicated&nbsp;<a href=\"https:\/\/chinaledscreens.com\/technology-quality\/\">technology &amp; quality<\/a>&nbsp;page is often where a factory reveals whether they have real process control\u2014or just marketing claims.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"step-8-packaging-shipping-and-customs-execution\">Step 8: Packaging, shipping, and customs execution<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"packaging-don-t-let-standard-packing-decide-your-outcome-\">Packaging (don\u2019t let \u201cstandard packing\u201d decide your outcome)<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">For fa\u00e7ade or glass-adjacent products, insist on:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Shock protection (corner protection + foam density appropriate to weight)<\/li>\n\n\n\n<li>Moisture control (desiccants + sealed packing where needed)<\/li>\n\n\n\n<li>Clear crate labeling (panel IDs matching packing list + spares list)<\/li>\n\n\n\n<li>Photos\/video of packed crates before pickup<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"shipping-mode-choices\">Shipping mode choices<\/h3>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Sea freight<\/strong>: best cost for volume; plan schedule buffers<\/li>\n\n\n\n<li><strong>Air freight<\/strong>: for samples\/urgent replacements; costly but saves projects<\/li>\n\n\n\n<li><strong>Hybrid<\/strong>: ship core order by sea, critical spares by air<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"customs-your-broker-is-part-of-the-engineering-team\">Customs: your broker is part of the engineering team<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Treat your customs broker like a stakeholder:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Share BOM, product description, use case, and compliance documents<\/li>\n\n\n\n<li>Confirm duties\/taxes early to avoid budget surprises<\/li>\n\n\n\n<li>Make sure invoice descriptions are accurate (mislabeling creates risk)<\/li>\n<\/ul>\n\n\n\n<div class=\"wp-block-greenshift-blocks-image gspb_image gspb_image-id-gsbp-bfe3cdf\" id=\"gspb_image-id-gsbp-bfe3cdf\"><img decoding=\"async\" src=\"https:\/\/chinaledscreens.com\/wp-content\/uploads\/2025\/12\/LED-Display-Packaging-shipping-and-customs-execution.jpeg\" data-src=\"\" alt=\"LED Display Packaging, shipping, and customs execution\" loading=\"lazy\" width=\"1400\" height=\"764\"\/><\/div>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"step-9-installation-spares-and-after-sales-where-import-roi-is-decided-\">Step 9: Installation, spares, and after-sales (where import ROI is decided)<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Your import doesn\u2019t end when the container lands. It ends when the system runs reliably.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"spares-policy-realistic-not-optimistic-\">Spares policy (realistic, not optimistic)<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">For first projects, many integrators use a baseline like:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Extra modules to cover early failures + handling damage<\/li>\n\n\n\n<li>Spare power supplies and key control components<\/li>\n\n\n\n<li>A documented \u201cmatching strategy\u201d (color\/brightness bin consistency)<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\" id=\"remote-support-documentation\">Remote support + documentation<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Insist on:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Wiring diagrams and labeling standard<\/li>\n\n\n\n<li>Control system configuration backup<\/li>\n\n\n\n<li>Fault diagnosis checklist with decision tree<\/li>\n\n\n\n<li>Response-time commitments for technical questions<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">If you\u2019re sourcing from a factory that offers&nbsp;<a href=\"https:\/\/chinaledscreens.com\/services\/\">OEM\/ODM services<\/a>, clarify what \u201cODM\u201d actually includes: firmware tweaks, mechanical customization, private labeling, packaging standards, and spare continuity commitments.<\/p>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"a-realistic-import-timeline-plan-backward-from-opening-day-\">A realistic import timeline (plan backward from opening day)<\/h2>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><thead><tr><th>Phase<\/th><th class=\"has-text-align-right\" data-align=\"right\">Typical duration<\/th><th>Risk if rushed<\/th><\/tr><\/thead><tbody><tr><td>Requirements + RFQ<\/td><td class=\"has-text-align-right\" data-align=\"right\">1\u20132 weeks<\/td><td>Wrong product family \/ wrong spec<\/td><\/tr><tr><td>Sampling + validation<\/td><td class=\"has-text-align-right\" data-align=\"right\">1\u20133 weeks<\/td><td>Daylight\/thermal surprises onsite<\/td><\/tr><tr><td>Production<\/td><td class=\"has-text-align-right\" data-align=\"right\">2\u20136 weeks<\/td><td>BOM drift, inconsistent calibration<\/td><\/tr><tr><td>FAT + inspection<\/td><td class=\"has-text-align-right\" data-align=\"right\">2\u20137 days<\/td><td>Hidden defects ship overseas<\/td><\/tr><tr><td>Shipping (sea)<\/td><td class=\"has-text-align-right\" data-align=\"right\">3\u20137 weeks<\/td><td>Missed opening dates<\/td><\/tr><tr><td>Customs + delivery<\/td><td class=\"has-text-align-right\" data-align=\"right\">3\u201310 days<\/td><td>Documentation delays<\/td><\/tr><tr><td>Install + commissioning<\/td><td class=\"has-text-align-right\" data-align=\"right\">1\u20133 weeks<\/td><td>Spares\/support gaps<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"the-deep-import-habits-that-separate-pros-from-first-timers\">The \u201cdeep\u201d import habits that separate pros from first-timers<\/h2>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Lock the BOM<\/strong>&nbsp;like you lock structural steel grade\u2014because it is the system\u2019s DNA<\/li>\n\n\n\n<li>Ask for&nbsp;<strong>sustained brightness<\/strong>&nbsp;and thermal behavior, not peak marketing numbers<\/li>\n\n\n\n<li>Treat service access as a design constraint, not a future problem<\/li>\n\n\n\n<li>Build spares into the first order, not the second emergency order<\/li>\n\n\n\n<li>Use third-party inspection strategically: first order, new model, or new supplier<\/li>\n<\/ul>\n\n\n\n<hr class=\"wp-block-separator has-alpha-channel-opacity\"\/>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"closing-make-your-first-import-repeatable\">Closing: make your first import repeatable<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Importing transparent LED from China in 2026 is not hard\u2014the hard part is making it&nbsp;<strong>predictable<\/strong>: spec reality, supplier discipline, QC depth, and a logistics plan that respects schedules and spares.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If you want help scoping an RFQ, validating a BOM, or aligning a solution path with your fa\u00e7ade constraints, you can&nbsp;<a href=\"https:\/\/chinaledscreens.com\/contact-us\/\">contact our team<\/a>&nbsp;and share your use case, drawings, and viewing conditions.<\/p>\n<\/div>\n\n\n\n<div class=\"wp-block-greenshift-blocks-container gspb_container gspb_container-gsbp-92fa685\" id=\"gspb_container-id-gsbp-92fa685\">\n<div class=\"wp-block-group alignwide is-content-justification-center is-layout-constrained wp-container-core-group-is-layout-9a0764d9 wp-block-group-is-layout-constrained\" style=\"margin-top:0;margin-bottom:0;padding-top:calc( 0.5 * var(--wp--style--root--padding-right, var(--wp--custom--gap--horizontal)));padding-right:var(--wp--style--root--padding-right, var(--wp--custom--gap--horizontal));padding-bottom:calc( 0.5 * var(--wp--style--root--padding-right, var(--wp--custom--gap--horizontal)));padding-left:var(--wp--style--root--padding-left, var(--wp--custom--gap--horizontal))\">\n<div style=\"height:calc( 0.25 * var(--wp--style--root--padding-right, var(--wp--custom--gap--horizontal)))\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h3 class=\"wp-block-heading has-text-align-center\" id=\"popular-products-1\">Popular Transparent LED Products<\/h3>\n\n\n\n<div style=\"height:var(--wp--preset--spacing--20)\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-group alignwide is-layout-constrained wp-block-group-is-layout-constrained\">\n<div data-__private-preview-state=\"{&quot;isPreview&quot;:false,&quot;previewMessage&quot;:&quot;\\u5b9e\\u9645\\u7684\\u4ea7\\u54c1\\u4f1a\\u56e0\\u6d4f\\u89c8\\u9875\\u9762\\u7684\\u4e0d\\u540c\\u800c\\u6709\\u6240\\u5dee\\u5f02\\u3002&quot;}\" data-block-name=\"woocommerce\/product-collection\" data-dimensions=\"{&quot;widthType&quot;:&quot;fill&quot;,&quot;fixedWidth&quot;:&quot;&quot;}\" data-display-layout=\"{&quot;type&quot;:&quot;flex&quot;,&quot;columns&quot;:3}\" data-query-context-includes=\"[&quot;collection&quot;]\" data-query-id=\"0\" data-query=\"{&quot;perPage&quot;:3,&quot;pages&quot;:0,&quot;offset&quot;:0,&quot;postType&quot;:&quot;product&quot;,&quot;orderBy&quot;:&quot;random&quot;,&quot;search&quot;:&quot;&quot;,&quot;exclude&quot;:[],&quot;inherit&quot;:false,&quot;taxQuery&quot;:[],&quot;isProductCollectionBlock&quot;:true,&quot;woocommerceOnSale&quot;:false,&quot;woocommerceStockStatus&quot;:[&quot;instock&quot;],&quot;woocommerceAttributes&quot;:[],&quot;woocommerceHandPickedProducts&quot;:[]}\" data-tag-name=\"div\" class=\"wp-block-woocommerce-product-collection alignfull is-layout-flow wp-block-woocommerce-product-collection-is-layout-flow\"><ul data-block-name=\"woocommerce\/product-template\" class=\"is-flex-container columns-3 wc-block-product-template alignwide wp-block-woocommerce-product-template is-layout-flow wp-block-woocommerce-product-template-is-layout-flow\" data-wp-on--scroll=\"actions.watchScroll\" data-wp-init=\"callbacks.initResizeObserver\"><li class=\"wc-block-product post-786 product type-product status-publish has-post-thumbnail product_cat-adhesive-flexible-led-film-screens product_tag-bendable-led-film product_tag-flexible-led-display product_tag-glass-led-display product_tag-self-adhesive-led product_tag-smd-transparent-screen product_tag-transparent-led-film first instock shipping-taxable product-type-simple\"\n\t\t\t\t\t\n\t\t\t\tdata-wp-interactive=\"woocommerce\/product-collection\"\n\t\t\t\tdata-wp-context='woocommerce\/products::{\"productId\":786,\"variationId\":null}'\n\t\t\t\tdata-wp-key=\"product-item-786\"\n\t\t\t\n\t\t\t\t>\n\t\t\t\t\t\n<div data-aspect-ratio=\"1\" data-block-name=\"woocommerce\/product-image\" data-is-descendent-of-query-loop=\"true\" data-show-sale-badge=\"false\" class=\"wc-block-components-product-image wc-block-grid__product-image wc-block-components-product-image--aspect-ratio-1 wp-block-woocommerce-product-image\"><a href=\"https:\/\/chinaledscreens.com\/fr\/rf-series-transparent-led-flexible-film-display-screen-smd\/\" data-wp-on--click=\"woocommerce\/product-collection::actions.viewProduct\"><img decoding=\"async\" width=\"1000\" height=\"1000\" src=\"https:\/\/chinaledscreens.com\/wp-content\/uploads\/2025\/11\/adhesive-flexible-LED-film-RF-Series.jpg\" class=\"attachment-large size-large\" alt=\"adhesive flexible LED film RF Series\" data-testid=\"product-image\" data-image-id=\"839\" style=\"object-fit:cover;aspect-ratio:1;\" loading=\"lazy\" srcset=\"https:\/\/chinaledscreens.com\/wp-content\/uploads\/2025\/11\/adhesive-flexible-LED-film-RF-Series.jpg 1000w, https:\/\/chinaledscreens.com\/wp-content\/uploads\/2025\/11\/adhesive-flexible-LED-film-RF-Series-300x300.jpg 300w, https:\/\/chinaledscreens.com\/wp-content\/uploads\/2025\/11\/adhesive-flexible-LED-film-RF-Series-150x150.jpg 150w, https:\/\/chinaledscreens.com\/wp-content\/uploads\/2025\/11\/adhesive-flexible-LED-film-RF-Series-768x768.jpg 768w, https:\/\/chinaledscreens.com\/wp-content\/uploads\/2025\/11\/adhesive-flexible-LED-film-RF-Series-12x12.jpg 12w, https:\/\/chinaledscreens.com\/wp-content\/uploads\/2025\/11\/adhesive-flexible-LED-film-RF-Series-500x500.jpg 500w, https:\/\/chinaledscreens.com\/wp-content\/uploads\/2025\/11\/adhesive-flexible-LED-film-RF-Series-600x600.jpg 600w, https:\/\/chinaledscreens.com\/wp-content\/uploads\/2025\/11\/adhesive-flexible-LED-film-RF-Series-100x100.jpg 100w\" sizes=\"auto, (max-width: 1000px) 100vw, 1000px\" \/><div class=\"wc-block-components-product-image__inner-container\">\n\n<\/div><\/a><\/div>\n\n<h2 style=\"line-height:1.4\" class=\"has-text-align-left wp-block-post-title has-medium-font-size\"><a data-wp-on--click=\"woocommerce\/product-collection::actions.viewProduct\" href=\"https:\/\/chinaledscreens.com\/fr\/rf-series-transparent-led-flexible-film-display-screen-smd\/\" target=\"_self\" >RF Series Transparent LED Flexible Film Display Screen SMD<\/a><\/h2>\n\n<div data-block-name=\"woocommerce\/product-price\" data-font-size=\"small\" data-is-descendent-of-query-loop=\"true\" data-text-align=\"left\" class=\"wp-block-woocommerce-product-price\" ><div class=\"wc-block-components-product-price wc-block-grid__product-price has-font-size has-small-font-size has-text-align-left\" style=\"\" >\n\t\t\t\t\t\n\t\t\t\t<\/div><\/div>\n\n\t\t\t\t<\/li><li class=\"wc-block-product post-3411 product type-product status-publish has-post-thumbnail product_cat-mesh-led-displays product_tag-architectural-led-mesh product_tag-flexible-mesh-led-screen product_tag-ip67-mesh-led-screen product_tag-kj-series-flexible-mesh-led-screen product_tag-media-facade-led-screen product_tag-outdoor-mesh-led-facade product_tag-transparent-mesh-led-display  instock shipping-taxable product-type-simple\"\n\t\t\t\t\t\n\t\t\t\tdata-wp-interactive=\"woocommerce\/product-collection\"\n\t\t\t\tdata-wp-context='woocommerce\/products::{\"productId\":3411,\"variationId\":null}'\n\t\t\t\tdata-wp-key=\"product-item-3411\"\n\t\t\t\n\t\t\t\t>\n\t\t\t\t\t\n<div data-aspect-ratio=\"1\" data-block-name=\"woocommerce\/product-image\" data-is-descendent-of-query-loop=\"true\" data-show-sale-badge=\"false\" class=\"wc-block-components-product-image wc-block-grid__product-image wc-block-components-product-image--aspect-ratio-1 wp-block-woocommerce-product-image\"><a href=\"https:\/\/chinaledscreens.com\/fr\/kj-series-flexible-mesh-led-screen-for-facades\/\" data-wp-on--click=\"woocommerce\/product-collection::actions.viewProduct\"><img decoding=\"async\" width=\"1024\" height=\"1024\" src=\"https:\/\/chinaledscreens.com\/wp-content\/uploads\/2026\/03\/KJ-Series-Flexible-Mesh-LED-Screen-for-Facades.jpg\" class=\"attachment-large size-large\" alt=\"KJ Series Flexible Mesh LED Screen for Facades\" data-testid=\"product-image\" data-image-id=\"3413\" style=\"object-fit:cover;aspect-ratio:1;\" loading=\"lazy\" srcset=\"https:\/\/chinaledscreens.com\/wp-content\/uploads\/2026\/03\/KJ-Series-Flexible-Mesh-LED-Screen-for-Facades.jpg 1024w, https:\/\/chinaledscreens.com\/wp-content\/uploads\/2026\/03\/KJ-Series-Flexible-Mesh-LED-Screen-for-Facades-300x300.jpg 300w, https:\/\/chinaledscreens.com\/wp-content\/uploads\/2026\/03\/KJ-Series-Flexible-Mesh-LED-Screen-for-Facades-150x150.jpg 150w, https:\/\/chinaledscreens.com\/wp-content\/uploads\/2026\/03\/KJ-Series-Flexible-Mesh-LED-Screen-for-Facades-768x768.jpg 768w, https:\/\/chinaledscreens.com\/wp-content\/uploads\/2026\/03\/KJ-Series-Flexible-Mesh-LED-Screen-for-Facades-12x12.jpg 12w, https:\/\/chinaledscreens.com\/wp-content\/uploads\/2026\/03\/KJ-Series-Flexible-Mesh-LED-Screen-for-Facades-500x500.jpg 500w, https:\/\/chinaledscreens.com\/wp-content\/uploads\/2026\/03\/KJ-Series-Flexible-Mesh-LED-Screen-for-Facades-600x600.jpg 600w, https:\/\/chinaledscreens.com\/wp-content\/uploads\/2026\/03\/KJ-Series-Flexible-Mesh-LED-Screen-for-Facades-100x100.jpg 100w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><div class=\"wc-block-components-product-image__inner-container\">\n\n<\/div><\/a><\/div>\n\n<h2 style=\"line-height:1.4\" class=\"has-text-align-left wp-block-post-title has-medium-font-size\"><a data-wp-on--click=\"woocommerce\/product-collection::actions.viewProduct\" href=\"https:\/\/chinaledscreens.com\/fr\/kj-series-flexible-mesh-led-screen-for-facades\/\" target=\"_self\" >KJ Series Flexible Mesh LED Screen for Facades<\/a><\/h2>\n\n<div data-block-name=\"woocommerce\/product-price\" data-font-size=\"small\" data-is-descendent-of-query-loop=\"true\" data-text-align=\"left\" class=\"wp-block-woocommerce-product-price\" ><div class=\"wc-block-components-product-price wc-block-grid__product-price has-font-size has-small-font-size has-text-align-left\" style=\"\" >\n\t\t\t\t\t\n\t\t\t\t<\/div><\/div>\n\n\t\t\t\t<\/li><li class=\"wc-block-product post-794 product type-product status-publish has-post-thumbnail product_cat-led-grille-screen product_tag-curtain-wall-led-display product_tag-high-brightness-led-display product_tag-ip66-weatherproof-led product_tag-led-grille-screen product_tag-outdoor-transparent-led product_tag-self-cooling-led-screen  instock shipping-taxable product-type-simple\"\n\t\t\t\t\t\n\t\t\t\tdata-wp-interactive=\"woocommerce\/product-collection\"\n\t\t\t\tdata-wp-context='woocommerce\/products::{\"productId\":794,\"variationId\":null}'\n\t\t\t\tdata-wp-key=\"product-item-794\"\n\t\t\t\n\t\t\t\t>\n\t\t\t\t\t\n<div data-aspect-ratio=\"1\" data-block-name=\"woocommerce\/product-image\" data-is-descendent-of-query-loop=\"true\" data-show-sale-badge=\"false\" class=\"wc-block-components-product-image wc-block-grid__product-image wc-block-components-product-image--aspect-ratio-1 wp-block-woocommerce-product-image\"><a href=\"https:\/\/chinaledscreens.com\/fr\/kj-series-outdoor-transparent-led-grille-led-screen\/\" data-wp-on--click=\"woocommerce\/product-collection::actions.viewProduct\"><img decoding=\"async\" width=\"600\" height=\"600\" src=\"https:\/\/chinaledscreens.com\/wp-content\/uploads\/2025\/11\/KJ-Series-Outdoor-Transparent-LED-Grille-LED-Screen-8.png\" class=\"attachment-large size-large\" alt=\"KJ Series Outdoor Transparent LED Grille LED Screen 8\" data-testid=\"product-image\" data-image-id=\"990\" style=\"object-fit:cover;aspect-ratio:1;\" loading=\"lazy\" srcset=\"https:\/\/chinaledscreens.com\/wp-content\/uploads\/2025\/11\/KJ-Series-Outdoor-Transparent-LED-Grille-LED-Screen-8.png 600w, https:\/\/chinaledscreens.com\/wp-content\/uploads\/2025\/11\/KJ-Series-Outdoor-Transparent-LED-Grille-LED-Screen-8-300x300.png 300w, https:\/\/chinaledscreens.com\/wp-content\/uploads\/2025\/11\/KJ-Series-Outdoor-Transparent-LED-Grille-LED-Screen-8-150x150.png 150w, https:\/\/chinaledscreens.com\/wp-content\/uploads\/2025\/11\/KJ-Series-Outdoor-Transparent-LED-Grille-LED-Screen-8-12x12.png 12w, https:\/\/chinaledscreens.com\/wp-content\/uploads\/2025\/11\/KJ-Series-Outdoor-Transparent-LED-Grille-LED-Screen-8-500x500.png 500w, https:\/\/chinaledscreens.com\/wp-content\/uploads\/2025\/11\/KJ-Series-Outdoor-Transparent-LED-Grille-LED-Screen-8-100x100.png 100w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><div class=\"wc-block-components-product-image__inner-container\">\n\n<\/div><\/a><\/div>\n\n<h2 style=\"line-height:1.4\" class=\"has-text-align-left wp-block-post-title has-medium-font-size\"><a data-wp-on--click=\"woocommerce\/product-collection::actions.viewProduct\" href=\"https:\/\/chinaledscreens.com\/fr\/kj-series-outdoor-transparent-led-grille-led-screen\/\" target=\"_self\" >KJ Series Outdoor Transparent LED Grille LED Screen<\/a><\/h2>\n\n<div data-block-name=\"woocommerce\/product-price\" data-font-size=\"small\" data-is-descendent-of-query-loop=\"true\" data-text-align=\"left\" class=\"wp-block-woocommerce-product-price\" ><div class=\"wc-block-components-product-price wc-block-grid__product-price has-font-size has-small-font-size has-text-align-left\" style=\"\" >\n\t\t\t\t\t\n\t\t\t\t<\/div><\/div>\n\n\t\t\t\t<\/li><\/ul><\/div>\n\n\n\n<div class=\"wp-block-buttons alignwide is-content-justification-center is-layout-flex wp-container-core-buttons-is-layout-9d2ce475 wp-block-buttons-is-layout-flex\">\n<div class=\"wp-block-button\"><a class=\"wp-block-button__link has-text-align-center wp-element-button\" href=\"https:\/\/chinaledscreens.com\/products\/\">Explore All Products<\/a><\/div>\n<\/div>\n<\/div>\n\n\n\n<div style=\"height:calc( 0.25 * var(--wp--style--root--padding-right, var(--wp--custom--gap--horizontal)))\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n<\/div>\n<\/div>\n<\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":2,"featured_media":2687,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_gspb_post_css":".gspb_container-id-gsbp-294415b,.gspb_container-id-gsbp-92fa685,.gspb_container-id-gsbp-99f7b36,.gspb_container-id-gsbp-c559416,.gspb_container-id-gsbp-d9ea1af{flex-direction:column;box-sizing:border-box}#gspb_container-id-gsbp-294415b.gspb_container>p:last-of-type,#gspb_container-id-gsbp-92fa685.gspb_container>p:last-of-type,#gspb_container-id-gsbp-99f7b36.gspb_container>p:last-of-type,#gspb_container-id-gsbp-c559416.gspb_container>p:last-of-type,#gspb_container-id-gsbp-d9ea1af.gspb_container>p:last-of-type{margin-bottom:0}#gspb_container-id-gsbp-294415b.gspb_container{position:relative;display:grid;grid-template-columns:repeat(1,minmax(0,1fr));row-gap:20px;column-gap:20px}@media (max-width:575.98px){#gspb_container-id-gsbp-294415b.gspb_container{grid-template-columns:repeat(1,minmax(0,1fr))}}#gspb_container-id-gsbp-99f7b36.gspb_container,#gspb_container-id-gsbp-d9ea1af.gspb_container{position:relative}#gspb_container-id-gsbp-99f7b36.gspb_container{display:grid;grid-template-columns:repeat(1,minmax(0,1fr));row-gap:20px;column-gap:20px}@media (max-width:575.98px){#gspb_container-id-gsbp-99f7b36.gspb_container{grid-template-columns:repeat(1,minmax(0,1fr))}}#gspb_container-id-gsbp-c559416.gspb_container{position:relative;color:var(--wp--preset--color--palette-color-4, var(--theme-palette-color-4, #000000));margin-bottom:0}#gspb_image-id-gsbp-0b8d0e0 img,#gspb_image-id-gsbp-9be3f30 img,#gspb_image-id-gsbp-bfe3cdf img{vertical-align:top;display:inline-block;box-sizing:border-box;max-width:100%;height:auto}#gspb_container-id-gsbp-92fa685.gspb_container{position:relative}","footnotes":""},"categories":[22],"tags":[251,250,254,253,255,252],"class_list":["post-2676","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-product-education-tech-explainers","tag-china-led-display-supplier","tag-import-transparent-led-display","tag-incoterms-led-display","tag-led-display-qc-checklist","tag-oem-odm-transparent-led","tag-transparent-led-procurement"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":8}},"_links":{"self":[{"href":"https:\/\/chinaledscreens.com\/fr\/wp-json\/wp\/v2\/posts\/2676","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/chinaledscreens.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/chinaledscreens.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/chinaledscreens.com\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/chinaledscreens.com\/fr\/wp-json\/wp\/v2\/comments?post=2676"}],"version-history":[{"count":2,"href":"https:\/\/chinaledscreens.com\/fr\/wp-json\/wp\/v2\/posts\/2676\/revisions"}],"predecessor-version":[{"id":3346,"href":"https:\/\/chinaledscreens.com\/fr\/wp-json\/wp\/v2\/posts\/2676\/revisions\/3346"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/chinaledscreens.com\/fr\/wp-json\/wp\/v2\/media\/2687"}],"wp:attachment":[{"href":"https:\/\/chinaledscreens.com\/fr\/wp-json\/wp\/v2\/media?parent=2676"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/chinaledscreens.com\/fr\/wp-json\/wp\/v2\/categories?post=2676"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/chinaledscreens.com\/fr\/wp-json\/wp\/v2\/tags?post=2676"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}